Povratak znanju
Power Up a REnewable Society - Oslo pilot activity
Oslo has committed to a 95% reduction in emissions by 2030 — but existing policies get the city only to 70%. The remaining gap depends on electrifying construction sites, heavy-duty vehicles, and harbour operations. The constraint is not ambition but grid capacity: no significant new capacity is expected before 2030. PURE asks how Oslo can electrify faster than the grid can grow — through better energy management, flexibility, demand-side coordination, and cross-sector collaboration. The project produces practical guidelines for zero-emission construction (ZEMCON) and heavy-duty vehicle (HDV) charging, convenes a national industry platform, and distills lessons into EU policy recommendations.

Komentari ()

Preuzmi (English)

Autori

Oznake

BuildingEnergySustainable fuel
Prema licenci CC BY-NC-SA
Ova licenca dopušta ponovnim korisnicima da distribuiraju, remiksiraju, prilagode i nadograđuju materijal u bilo kojem mediju ili formatu isključivo u nekomercijalne svrhe, i to samo pod uvjetom da se navede autorstvo. Ako remiksirate, prilagodite ili nadogradite materijal, morate izmijenjeni materijal licencirati pod istim uvjetima.