Tillbaka till kunskapsbanken
Power Up a REnewable Society - Oslo pilot activity
Oslo has committed to a 95% reduction in emissions by 2030 — but existing policies get the city only to 70%. The remaining gap depends on electrifying construction sites, heavy-duty vehicles, and harbour operations. The constraint is not ambition but grid capacity: no significant new capacity is expected before 2030. PURE asks how Oslo can electrify faster than the grid can grow — through better energy management, flexibility, demand-side coordination, and cross-sector collaboration. The project produces practical guidelines for zero-emission construction (ZEMCON) and heavy-duty vehicle (HDV) charging, convenes a national industry platform, and distills lessons into EU policy recommendations.

Kommentarer ()

Ladda ner (English)

Författare

Taggar

BuildingEnergySustainable fuel
Under licens CC BY-NC-SA
Denna licens ger återanvändare rätt att sprida, bearbeta, anpassa och vidareutveckla materialet i vilket medium eller format som helst, men endast för icke-kommersiella ändamål och under förutsättning att upphovsmannen anges. Om du bearbetar, anpassar eller vidareutvecklar materialet måste du licensiera det modifierade materialet på identiska villkor.