Tagasi teadmiste juurde
Power Up a REnewable Society - Oslo pilot activity
Oslo has committed to a 95% reduction in emissions by 2030 — but existing policies get the city only to 70%. The remaining gap depends on electrifying construction sites, heavy-duty vehicles, and harbour operations. The constraint is not ambition but grid capacity: no significant new capacity is expected before 2030. PURE asks how Oslo can electrify faster than the grid can grow — through better energy management, flexibility, demand-side coordination, and cross-sector collaboration. The project produces practical guidelines for zero-emission construction (ZEMCON) and heavy-duty vehicle (HDV) charging, convenes a national industry platform, and distills lessons into EU policy recommendations.

Kommentaarid ()

Lae alla (English)

Autorid

Sildid

BuildingEnergySustainable fuel
Litsentsi alusel CC BY-NC-SA
Käesolev litsents lubab materjali edasikasutajatel seda levitada, ümber töötada, kohandada ja sellele tugineda mis tahes andmekandjal või formaadis ainult mittekaubanduslikel eesmärkidel ning tingimusel, et loojale antakse asjakohane tunnustus. Kui te materjali ümber töötate, kohandate või sellele tuginete, peate muudetud materjalile andma litsentsi samadel tingimustel.