Torna alla sezione "Conoscenze"
Power Up a REnewable Society - Oslo pilot activity
Oslo has committed to a 95% reduction in emissions by 2030 — but existing policies get the city only to 70%. The remaining gap depends on electrifying construction sites, heavy-duty vehicles, and harbour operations. The constraint is not ambition but grid capacity: no significant new capacity is expected before 2030. PURE asks how Oslo can electrify faster than the grid can grow — through better energy management, flexibility, demand-side coordination, and cross-sector collaboration. The project produces practical guidelines for zero-emission construction (ZEMCON) and heavy-duty vehicle (HDV) charging, convenes a national industry platform, and distills lessons into EU policy recommendations.

Commenti ()

Autori

Etichette

BuildingEnergySustainable fuel
Sotto licenza CC BY-NC-SA
La presente licenza consente ai riutilizzatori di distribuire, rielaborare, adattare e sviluppare il materiale su qualsiasi supporto o formato esclusivamente per scopi non commerciali, a condizione che venga citata la fonte. Se si rielabora, si adatta o si sviluppa il materiale, è necessario concedere in licenza il materiale modificato a condizioni identiche.